√在线天堂中文最新版网,97se亚洲综合色区,国产成人av免费网址,国产成人av在线影院无毒,成人做爰100部片

×

manual signal box造句

"manual signal box"是什么意思   

例句與造句

  1. The manual signal box and crossing gates were removed a few years ago and replaced by barriers.
  2. This section has several manual signal boxes with semaphore signalling and manned & gated level crossings in operation.
  3. Both remaining manual signal boxes were closed with new multiple aspect signalling commissioned and all lines through the station coming under the control of the West Midlands Signalling Centre at Saltley.
  4. It was also re-signalled in the spring of 2010 as part of the Durham Coast modernisation scheme, with the consequent loss of three manual signal boxes in & around the station.
  5. Half of the station frontage ( including the former waiting and refreshment rooms ) that had been disused for years was demolished in May 2009 . The station retains its semaphore signalling and manual signal box.
  6. It's difficult to find manual signal box in a sentence. 用manual signal box造句挺難的
  7. The route is now fully colour-light signalled all the way from Huyton to Wigan, though a manual signal box remains at St Helens Central, that at Huyton having been abolished and demolished in July 2014.
  8. Preliminary work to re-signal the route ahead of electrification was completed in August 2013, with the closure of the three remaining manual signal boxes at Bloxwich, Hednesford & Brereton Sidings and the panel boxes at Walsall & Bescot.
  9. Instead of reaching the city directly from the north, the Connecting Railway turned west, crossed the Schuylkill River on the wye junction controlled by three manual signal boxes; there was also an engine house in the center of the wye.
  10. By 1976, the replacement of the huge number of manual signal boxes with centralised power-signalling coupled with computer-based train control and more modern telecommunications systems meant that it was no longer necessary to display headcodes throughout the railway network.
  11. The lines through the station were re-signalled over the Christmas and New Year of 2015 16, with the new colour light signals installed and the old manual signal boxes at Wrawby Junction & Barnetby East closed during a 17-day blockade.
  12. In late 1973 and early 1974 the track layout was simplified and the manual signal box was removed in early 1990, along with other manual signal boxes on this line, and its function replaced by colour light signalling and power operated points, both controlled from Marylebone.
  13. In late 1973 and early 1974 the track layout was simplified and the manual signal box was removed in early 1990, along with other manual signal boxes on this line, and its function replaced by colour light signalling and power operated points, both controlled from Marylebone.
  14. However, the manual signal boxes at Banbury North and South remain, along with some GWR lower-quadrant signals controlling the bay platforms and sidings at the station, but it is proposed that the West Midlands ICC take over control as Oxford ( exclusive ) in 2014.
  15. Datchet had a manual signal box which also worked the manual level crossing gates, this and Mays crossing box closed in December 1974 when control has taken over by Feltham power box, this led to the replacement of the manual barriers with the lifting ones we have today.
  16. Services over the ex-ELR Preston extension from the Bamber Bridge direction finally ended in the autumn of 1972, when the line was closed ( as a result of the Preston area re-signalling scheme ) along with the remaining manual signal boxes in the area ( though a short section remained in use for freight to Lostock Hall gas works until 1977 ).

相鄰詞匯

  1. "manual shift"造句
  2. "manual shift lever"造句
  3. "manual shutdown"造句
  4. "manual sight"造句
  5. "manual signal"造句
  6. "manual signalling"造句
  7. "manual simulation"造句
  8. "manual skill"造句
  9. "manual sort"造句
  10. "manual sorting"造句
桌面版繁體版English日本語(yǔ)

Copyright ? 2025 WordTech Co.